Eden Park calls for infrastructure upgrades after rugby train delays

NZ Herald1NewsRNZStuffOtago Daily TimesSaturday 10 October 2026 · 5 outlets · 7 reports · updated

In this story All Blacks, Auckland Transport, Wayne Brown, Wallabies

Photo: NZ Herald (opens in new tab)

Thousands of rugby fans experienced delays of up to 45 minutes when travelling by train from Eden Park after the Bledisloe Cup match. Eden Park's chief executive has called for platform and pedestrian bridge upgrades, while Auckland Mayor Wayne Brown has disputed that the delays were an infrastructure problem.

Key facts

4 facts
  • All Blacks defeated the Wallabies 50-19 in the Bledisloe Cup match1News
  • Approximately 15,000 people used rail services for the event1NewsNZ HeraldRNZStuffOtago Daily Times
  • Fans experienced train wait times of up to 40 minutes1NewsNZ HeraldRNZStuffOtago Daily Times
  • The delay was linked to the Morningside Drive level crossing closure1NewsNZ HeraldStuffOtago Daily Times

The full story

1 min read · 5 outlets

Auckland Mayor Wayne Brown and Eden Park chief executive Nick Sautner have disagreed over the cause of train delays following the All Blacks' Bledisloe Cup win over the Wallabies. Thousands of fans experienced waits of up to 40 minutes for city-bound trains at Kingsland Station after the match.1NewsNZ HeraldRNZStuffOtago Daily Times

Sautner argued that the rail network requires urgent infrastructure upgrades, specifically mentioning platform improvements at Kingsland and Morningside stations and a pedestrian footbridge across Sandringham Road. He stated that connectivity between the stadium and the rail network has not improved in ten years despite City Rail Link investment.NZ HeraldRNZStuffOtago Daily Times

Mayor Brown countered that the disruption was an operational issue rather than an infrastructure problem. He claimed an initial audit showed the Morningside Drive level crossing was closed 30 minutes later than required by the approved traffic management plan by Eden Park's contractors.NZ HeraldStuffOtago Daily Times

Auckland Transport (AT) confirmed that the delay in closing the level crossing prevented trains from being positioned to depart Kingsland Station on time. AT reported that 15,000 people used rail for the event, while 19,710 people in total used special event public transport.1NewsNZ HeraldStuff

How it developed

  • Tue 13 Oct, 2:48pmMayor Wayne Brown stated that an initial audit indicated the level crossing was closed later than required by Eden Park's traffic management contractor.NZ Herald

Where reports differ

  • Sautner attributes the delays to a need for infrastructure upgrades like a footbridge, while Brown attributes them to operational failures by contractors to follow the traffic management planNZ HeraldStuffOtago Daily Times

Compiled from reports by NZ Herald, 1News, RNZ, Stuff and Otago Daily Times.

How they headlined it

First reported by NZ Herald, Sat 10 Oct, 10:24pm · 7 reports from 5 outlets over 3 days
  1. NZ HeraldNZ Herald

    Thousands of rugby fans hit by train delays, left waiting 45 minutes to travel from Eden Park (opens in new tab)

  2. 1News1News

    Eden Park trains need 'urgent attention’ after ABs match delays (opens in new tab)

  3. RNZRNZ

    Eden Park wants platform upgrades, pedestrian bridge to stop rail delays for fans (opens in new tab)

  4. StuffStuff

    ‘Stick to the facts’: Wayne Brown weighs in on Eden Park rail delays (opens in new tab)

  5. Otago Daily TimesOtago Daily Times

    Auckland mayor says rugby train delays not an infrastructure problem (opens in new tab)